FISHER/UNITECH Product Lifecycle Management Solutions FISHER/UNITECH Product Lifecycle Management Solutions Header Header
My Account
Login
Logout
Toll Free
Shopping Cart
800- 816-8314
items in cart:   0
total amount:   $0.00
About Us Products Products Education Events Support Services News Blog
view cart checkout
About Us > Case Studies >  Returning Customers click here to log in.
fu-left-bullet.gifAbout Us
x.gifBorg Warner Cooling Systems
x.gifCulligan
x.gifFanuc Robotics
x.gifGarmin International
x.gifGranco Clark
x.gifHoerbiger-Origa
x.gifNook Industries
x.gifPacific Bearing Corp.
x.gifTask Force Tips
x.gifCustomer Testimonials
x.gifLocations
x.gifPhilanthropy
Request a Quote
3D
Barry-Wehmiller
"We have become convinced that SolidWorks has the best vision for applying 3D productively"
Jim Webb, Director of Business Development

THE CHALLENGE
Barry-Wehmiller International Resources (BWIR) provides design and manufacturing systems consulting services to 25 Barry-Wehmiller companies and some of the world’s leading manufacturers. Lost productivity stemming from file conversions, data incompatibility, and design errors related to the inability to visualize the interaction of large assemblies in 2D, prompted BWIR to update its engineering platform to a single 3D design environment.

THE SOLUTION
BWIR selected the SolidWorks 3D mechanical design system as its standard design environment because of the system’s large assembly functionality, ease of use, short learning curve, affordability, and communications capabilities. By transitioning to SolidWorks software, BWIR shortened its design cycles by 25 percent, reduced production time by 30-40 percent, cut costs associated with ECOs and rework, and improved its collaboration and communication capabilities with its customers.

Industry:  Design & Engineering Services
Products:  COSMOSWorks, SolidWorks, eDrawings
Previous CAD System:  Pro/ENGINEER
Location:  Wisconsin
Reseller:  FISHER/UNITECH

Long PDF Version 

SUMMARY & METRICS
 - Shortened design cycles by as much as 25%
 - Reduced production time by as much as 30 to 40%
 - Cut costs associated with ECOs and rework
 - Improved collaboration/communication with customers

Find Barry-Wehmiller International Resources on the web at www.bwir.com.